Miller Turner's first major UK development comprises a 105 acre Business Park in the South West occupying an excellent location on both sides of the A38 situated to the south of Bristol and to the north of Taunton being within 1.5 miles of Junction 23 of the M5.
The quality of the environment at Express Park Bridgwater in terms of the attractive natural outlook, high standard of landscaping and contemporary office and distribution buildings creates a first class environment for a company's workforce. |
 |
The grade ‘A’ office buildings provide an innovative design and high level specification including raised floors, suspended ceilings, temperature controlled air circulation systems, atrium and ample parking.
The group managed and undertook the construction process in all its projects. The aim was to provide the best quality building at the most cost effective price to meet the client's needs. Our management team comprises experienced and qualified construction specialists who understand an occupiers needs and provide the most suitable solution.




Waterfront, Dearne Valley, Rotherham, comprises a 285 acre, 850.000 sq ft major mixed use site some 6 minutes drive from junction 36 of the M1 motorway near Rotherham, South Yorkshire which represents an investment of £130 million. Full planning permission was granted in March 2006.
Express Park is to develop 471 homes, apartments and a private retirement village partly built around an existing 49 acre lake.
A 9 hole pay and play golf course and golf driving range will add to the appeal together with a leisure/retail park to include an extreme sports unit, ten pin bowl, bingo, family restaurant, retail and health club.
In addition there will be a 48.000 sq ft major medical center/private hospital opportunity, a 21,998 sq ft neighborhood retail centre a Wolverhampton & Dudley Brewery Plc pub/restaurant, 164.00 sq ft of B1/B2/B8, a car showroom and petrol filling station will complete the commercial part of the site.





Miller Turner have acquired options over 84 acres of
Farmland adjacent to J.24 of the M5 motorway at Bridgwater.
Miller Turner are currently pursuing an outline mixed use planning
consent. The options are for a total of 10 years. It is
envisaged that a beneficial planning consent will be achieved
within a 2-3 year time frame. We are in a particularly strong
position to achieve progress given our local connections
and track record at Express Park.
The site is currently in agricultural use, well above the flood
plain and adjacent to a major residential development. It is
likely that mixed uses B1, B2 and B8 will be considered but
residential is also a possibility. Although no marketing has
taken place approaches have already been received from
high profile distribution occupiers. Stop Press EDF have
declared a formal interest in securing at least 50% of the
site for a park and ride and freight consolidation use which
could lead on to a staff housing requirement during the
construction of two new nuclear power plants at nearby
Hinkley Point, due to be Europes largest construction site
after the Olympics. Miller Turner's view is that the development of
the site should be planned around creating long term
investments.




Proposed modern water bottling and science park comprising of 44 acres, bringing private land into public use to the benefit of the town as a whole.
For Details Please Visit: